Interactive product concept — demo data.
Tasks come from four sources: the calendar, bookings, usage/condition signals and recurring mechanism exercise (lifts every 14 days, generator weekly, gate and pool cover monthly).
Miami Beach Villa · Jet Ski Lifts · Exercise
Due Aug 15 · now · every 14 days
Overdue against prolonged lowered position (MEC-501); schedule before 4:00 PM check-in.
Aventura Bay Condo · Locks/Security · Usage/condition
Due Aug 15 · in 1h
Battery 18% (ACC-801); bundle with today's turnover before 3:00 PM check-in.
Bundled with scheduled visit — Turnover cleaning
Lighthouse Point Retreat · Boat Lift · Usage/condition
Due Aug 16 · in 20h · every 14 days
Triggered by visual asymmetry (MEC-502). Inspection recommended, not a diagnosis.
Key Biscayne Bungalow · Gates/Garage · Exercise
Due Aug 18 · in 2 days · every 30 days
Combine with closing the gate (GTE-1101).
Miami Beach Villa · HVAC · Calendar
Due Aug 20 · in 4 days
Bundle with HVAC partner visit for ISS-101 if dispatched today.
Coral Gables Cottage · Pool · Booking-based
Due Aug 16 · in 22h
Covers missed 8/15 visit (SVC-301); guest checks in 8/16 4:00 PM.
Brickell Penthouse · Water/Plumbing · Calendar
Due Aug 17 · in 44h
Perform together with leak inspection follow-up (WAT-601).
Las Olas Waterfront · Generator · Exercise
Due Aug 21 · in 5 days · every 7 days
Last full cycle passed 2025-08-14; next due in six days.
Wynwood Loft · Environment/Humidity · Calendar
Due Aug 22 · in 6 days
Quarterly safety check.
Las Olas Waterfront · Boat Lift · Exercise
Due Aug 26 · in 10 days · every 14 days
Schedule in vacant window between bookings.
Pompano Shorehouse · Pool · Exercise
Due Sep 1 · in 16 days · every 30 days
Run in vacant morning window.